The WIDSON 250 platform is suitable for a wide range of construction, installation, and infrastructure works:
Dredging and Preparatory Works
- preparation and formation of design excavations
- operations involving sediment and soft silty seabed soils
- foundation preparation for hydraulic engineering structures
Foundation Formation and Material Placement
- placement of sand, crushed stone, and rock material
- construction of foundations for berths and platforms
- construction of new protective structures
Piling and Installation Works
- installation of piles and sheet piles
- installation of support structures
- use as a construction base for port infrastructure projects
Heavy Equipment Operations
- accommodation of crawler cranes with a lifting capacity of up to 200 tonnes
- use of anchoring systems
- cargo-handling and installation operations
Underwater Engineering Works
- installation and dismantling of underwater structures
- diving support for marine operations
- inspection and verification of structural elements
Associated Engineering Works
- borehole drilling
- cone penetration testing (CPT/CPTu)
- foundation quality control